代码人生

开发项目成本工时示例表格

代码人生 http://www.she9.com 2018-05-01 01:06 出处:网络 编辑:@霜伤
开发项目成本工时示例表格
Project Name**** DevProject IDBPD200508
ActivityActivity DescriptionsBillable (Y/N)Hours
RequirementCollecting, Analysing, Understanding, Reviewing requirements
1.00
DesignDevelopment of the system, subsystem, or component design. Includes development of UML diagram, prototyping for verify design idea and the writing of the design document. Design review effort is also included here.

ImplementationActually coding system components. Includes the unit test.
4.00
Bug-fixingThis effort only include those bugs that are formally reported by QAs via formal testing.

IntegrationHours spending on system integration.

User Manual Authoring


Test case designHours spending on test plan and test cases writing

Test prepIncludes the test envionment preparation, build, deployment, and data preparation.

Test execTime for executing the test cases

Bug verifyTime for verifing the bug fixes

Bug reportTime for writing the bug reports

CommunicationCommunication not related to above, such as supporting colleagues in email, phone, or face to face.
3.00
ResearchTime for research

TrainingTime for training

PMingEstimation, planning, tracking, reporting

Hot FixAny effort, coding, studying, testing, building, packaging, discussing, that is related to a specific hot fix.

OthersActivities not covered by above. Please describe here.

Total

8.00








一个软件项目成本构成由以下几个方面构成:

需求:包括需求收集,需求分析 ,理解需求,编写和审核需求文档所需的时间.


请关注公众号:程序你好
0

精彩评论

暂无评论...
验证码 换一张
取 消